Lay planning
Lay planning is deciding how many fabric layers, what lay lengths and which markers will be used to cut an order efficiently within the limits of the table and fabric.
What it means
The planner starts from order quantities by size and colour and chooses lays that split them. Longer lays and more plies save time but risk uneven cutting, and the limits are table length, cutter height and roll availability. The plan also considers fabric lots, so a lay uses one lot. The output is a lay list for the cutting section.
Example
For 3,000 pieces, a Surat planner chooses 10 lays of 100 plies rather than 30 lays of 33 plies. Marker making is cut by two thirds, but the cutting machine can handle a maximum of 100 plies, so the plan stops there.
Records and checks
- Record lay number, plies, marker, ratio, fabric lot and planned quantity.
- Verify the lay totals against the order by size and colour.
- The planner prepares; the cutting head approves feasibility.
Common mistakes
- Planning plies beyond what the machine can cut accurately.
- Combining two fabric lots in one lay to reach the plies.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →