Line efficiency
Line efficiency is the standard minutes earned by a sewing line's output, divided by the minutes the line was available, shown as a percentage.
What it means
Each garment has an SMV. Multiply it by pieces made to get minutes earned. The minutes available are operators times hours worked times 60. A line earning 4,200 of 6,000 available minutes is 70 percent efficient. Efficiency exposes waiting, breakdowns, poor balance and absenteeism, and it feeds into costing and target setting.
Example
A line with 30 operators works 8 hours, giving 14,400 available minutes. It makes 480 shirts at 21 SMV, earning 10,080 minutes, so line efficiency is 70 percent. The target was 75 percent, so the supervisor checks waiting time.
Records and checks
- Record output, SMV, operators present, hours worked and downtime reasons daily.
- Verify the SMV used against the approved operation bulletin.
- The line supervisor records; the production manager reviews daily.
Common mistakes
- Counting helpers or absent operators inconsistently in available minutes.
- Comparing lines producing styles of different difficulty without SMV.