Load plan
A load plan is a written plan showing which orders or items go on which vehicle, how they are arranged and the order of delivery or unloading.
What it means
Planners prepare it before loading starts. It lists the items, weights and volumes, matches them to a vehicle's capacity and arranges goods so the first drop is nearest the door. Heavy or fragile items are placed with care. A good plan also reduces handling at drop-off points, because nothing needs to be moved to reach the next consignment.
Example
A beverage distributor plans one truck with deliveries to four shops. The last shop's 60 crates go at the front, the first shop's 25 crates go nearest the door, and the total weight of 3.8 tonnes is checked against the truck's limit.
Records and checks
- Record vehicle, planned items, weights, drop sequence and driver name on the plan.
- Verify actual loaded items against the plan before the vehicle leaves.
- The dispatch planner prepares it; the loading supervisor ticks it off and signs.
Common mistakes
- Loading in order of readiness instead of drop sequence, forcing unloading and reloading at the first stop.
- Not recalculating when an order changes at the last minute, causing overload or a missed item.