lamp.
ResourcesPricingAbout

Marker planning

Marker planning is arranging all pattern pieces for the sizes in a lay on a marker within the fabric width, to cut waste while following grain and matching rules.

What it means

Planners choose the size mix, then fit pieces together like a puzzle while respecting grain line, direction of nap or print, and stripe or check matching. The marker is made by hand, on a computer, or by a plotter. Different ratios and widths give different efficiency, so several options are compared before one is approved.

Example

For a striped shirt order of 2,000 pieces in a Kolkata unit, the planner tests three ratio mixes. The best uses 2.12 metres per shirt versus 2.20, saving 160 metres of fabric on the order.

Records and checks

  • Record the marker number, sizes, ratio, length, width and efficiency.
  • Verify the plot against pattern files before cutting.
  • The marker planner prepares it; the cutting head approves it.

Common mistakes

  • Ignoring stripe matching rules, so garments fail inspection.
  • Using an old marker after a pattern change.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →