lamp.
ResourcesPricingAbout

Measurement specification

A measurement specification is a table of a garment's points of measure for every size with their allowed tolerances, used to check samples and bulk pieces.

What it means

It states, for instance, chest width, body length and sleeve length per size, and how far a measurement may differ, such as plus or minus 1 cm. It comes from the buyer or is made by the factory, then approved. Pattern makers use it to build patterns, and quality uses it to audit finished goods.

Example

A shirt spec gives chest 54 cm for size M with a tolerance of 1 cm. In a final check at a Gurugram factory, 6 of 40 sampled shirts measure 52.5 cm, so the lot is held and the sleeves and body are re-checked.

Records and checks

  • Record each point of measure, size, specification and tolerance.
  • Verify measurements on samples with the same method as the buyer.
  • The technical team maintains the spec; quality audits against it.

Common mistakes

  • Using body measurements in one place and garment measurements in another.
  • Not updating the spec after the buyer changes a comment.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →