Melt temperature
Melt temperature is the actual temperature of the molten plastic as it leaves the nozzle, which can differ from the heater settings on the barrel.
What it means
Barrel heaters are only set points. The real melt temperature also depends on screw speed, back pressure and residence time, as friction adds heat. Each plastic has a processing range. Below it the melt flows poorly, giving short shots and weak weld lines. Above it the resin degrades, giving burn marks, colour change and brittleness. It is best checked with a probe in a purged shot.
Example
A polypropylene job has barrel zones set to 220 °C, but a purge shot read with a probe shows 238 °C because of high screw speed. The material supplier's range tops at 230 °C. The setter lowers the screw speed and back pressure until the probe reads 226 °C, and the yellowing stops.
Records and checks
- Record the barrel settings, the probe reading, the date, the material and the machine and mould.
- Verify the reading again after any change in screw speed, cycle time or material lot.
- The setter measures, the supervisor checks it against the supplier's range, and quality reviews burn and weld-line defects.
Common mistakes
- Assuming the barrel setting equals the melt temperature.
- Leaving the machine idle and hot for long periods, which degrades material in the barrel.