MTTR
MTTR stands for mean time to repair: the average time taken to restore a failed machine to working order, over a set of repairs.
What it means
MTTR is total repair time divided by number of repairs. It tells you how fast the team recovers once something breaks, and it falls when spares are close at hand, procedures are clear and technicians are trained. Pair it with MTBF: a machine can fail often but be fixed fast, or fail rarely but take days to restore, and each calls for a different remedy.
Example
A bakery's oven fails five times a year. Repair times are 2, 6, 3, 2 and 2 hours, giving an MTTR of 3 hours. Keeping a heating element in stock would cut the 6-hour wait and bring MTTR near 2.
Records and checks
- Record time of fault, start of repair, finish and restart, and the cause of each repair.
- Verify that the same start and end points are used for every repair.
- The technician records the times; the maintenance supervisor reviews MTTR by machine and fault type.
Common mistakes
- Ignoring waiting for parts, which is often the longest part of the delay.
- Averaging across unlike machines, which hides which one is slow to fix.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →