lamp.
ResourcesPricingAbout

Net metering

Net metering is an arrangement where a consumer with its own solar system exports surplus power to the grid and is billed only on net units drawn.

What it means

A bi directional meter records the units imported from and exported to the grid. At the end of the billing cycle, exports are set against imports, so that only the difference is billed, or the surplus is carried to the next period under the rules in force. Terms differ by state: the size allowed, whether surplus is paid for, and the period in which credits expire.

Example

A cold storage in Nashik with a rooftop plant imports 9,000 units in a month and exports 2,500 units on weekends. After net metering, it is billed on 6,500 units. Without it, the exported power would earn nothing.

Records and checks

  • Record the import and export readings from the meter, the net units and the credits carried forward.
  • Verify the utility's bill against the readings and the agreed net metering terms.
  • The accountant checks every month and the owner raises any mismatch with the utility.

Common mistakes

  • Assuming exported units are paid in cash, when many arrangements give only credit.
  • Installing more capacity than the permitted limit.

Check the current rule on the official portal or with your CA before acting.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →