Non-conformance report
A non-conformance report is the written record of a failure to meet a requirement, the decision taken on the affected goods and the follow-up action.
What it means
It is the paper trail for a non-conformance. The report is numbered, states the product, quantity, defect and where it was found, then records the disposal decision, such as scrap, rework, return to supplier or accept under a customer concession. It also records root cause and action.
Example
NCR 057 at a bearing housing line notes 180 pieces with a bore 0.04 mm undersize, found at final inspection on 14 March. Decision: rework by reboring. Cause: a worn boring bar. Action: replace the bar and add a tool-life limit of 800 pieces. The report closes after the next three lots pass.
Records and checks
- Record the NCR number, product, quantity, defect, disposal, root cause and action with due dates.
- Verify that the disposal was actually carried out and that the action stopped recurrence.
- The inspector raises it, the quality head closes it, and the owner reviews open ones monthly.
Common mistakes
- Leaving reports open for months with no owner or due date.
- Filing reports without sorting them to see which defects repeat.