On-time in-full delivery

On-time in-full delivery is the share of orders that arrive both by the promised date and with the complete ordered quantity, in the right condition.

What it means

On-time delivery can look excellent while the goods are short, and a full delivery can come a week late. Measuring both together is stricter. An order counts as successful only when it passes on date and on quantity, and often on accuracy of the items and the documents. It better reflects what the customer experiences. It is abbreviated OTIF and is common in dealings with large retailers, who may levy charges on misses.

Example

A Ghaziabad ready-mix paint distributor delivered 50 orders to retailers in a fortnight. 45 arrived by the promised date, but 6 of those were short by a few cans. 39 were both on time and complete, so OTIF is 39 divided by 50, or 78 per cent, against an on-time rate of 90 per cent.

Records and checks

  • Record the order, promised date, ordered and delivered quantity, and any damage or wrong item.
  • Verify the delivered quantity from the receiving record signed by the customer.
  • Dispatch keeps the records; the sales head reviews the rate and the causes of misses monthly.

Common mistakes

  • Counting an order as in full when the missing quantity was cancelled after the delivery.
  • Using the date on which the vehicle left, not the date the customer received the goods.