Palletisation
Palletisation is the practice of stacking goods on pallets and securing them with wrap, straps or corner guards so they can be handled and shipped as unit loads.
What it means
A good pallet plan sets cartons per layer, number of layers, total height and weight. The stack should sit within the pallet edges, with heavy items at the bottom and a stable pattern such as interlocking layers. Wrapping holds the load together. Palletisation reduces handling time and damage but needs forklifts and loading space, and not every truck or small shop can handle it.
Example
A spice packer ships 5 kg cartons. By stacking 10 cartons per layer and 5 layers per pallet, each pallet holds 50 cartons, or 250 kg, and a truck of 14 pallets loads in 25 minutes rather than 2 hours.
Records and checks
- Record the pallet pattern for each product: cartons per layer, layers, and pallet weight.
- Verify finished pallets against the pattern for height, overhang and wrap before dispatch.
- The packing lead sets the pattern; dispatch counts pallets on each vehicle.
Common mistakes
- Stacking too high so the load tilts on turns or collapses on bumps.
- Changing the carton size without updating the pallet pattern, causing overhang.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →