Part weight

Part weight is the weight of one finished moulded part, used as a quick check on process stability, material use and cost per piece.

What it means

A part that is too light may be short of material or poorly packed, while one that is too heavy may be flashing or wasting resin. Weight is the easiest measure to check on the floor with a balance, so many plants control the process by it. Material cost per part is part weight times the price per kilogram, so a small drift multiplied over lakhs of parts matters.

Example

A bucket is specified at 410 g with a tolerance of plus or minus 5 g. On a run of 50,000 buckets, a drift to 418 g adds 8 g each, which is 400 kg of extra resin, worth about ₹50,000 at ₹125 a kg. The weight check at every hour catches the drift on the second reading.

Records and checks

  • Record the weight of sample parts at set intervals, with the cavity, time, machine and operator.
  • Verify the balance with a test weight each shift, and compare readings with the approved weight and tolerance.
  • The operator weighs, the quality inspector reviews the sheet, and the production head checks the weekly cost impact.

Common mistakes

  • Weighing the part along with its runner, which mixes two different numbers.
  • Using an uncalibrated balance, so the control chart is based on false readings.