PFMEA
PFMEA is the abbreviation for process failure mode and effects analysis, a step-by-step review of what could go wrong in making a product and how to prevent or catch it.
What it means
Where a design analysis looks at the product, this one looks at the way it is made. The team walks through each operation, such as cutting, welding, curing or packing, and asks which failures could occur, what effect they would have on the customer or the next operation, and what controls exist. The result drives the control plan, which says what is checked, how often and with which gauge.
Example
A Gurugram firm makes fuel tank brackets. At the welding step, the team lists a missed weld, caused by wire feed fluctuation, with effect of a loose tank mount. Existing detection is a visual check at the end of the shift. They add a poka-yoke fixture sensor and check the first piece after every setup.
Records and checks
- Record each operation, failure mode, cause, current control, ratings and the action agreed.
- Verify that the control plan and operator instructions reflect the actions after the analysis.
- The process engineer leads; production, maintenance and quality review and sign.
Common mistakes
- Copying a similar part's analysis without walking the actual process, which misses real risks.
- Relying on final inspection as the only control, which finds defects after cost has been added.