PLM
PLM stands for product lifecycle management, the practice of controlling a product's design data, revisions, approvals and changes from concept through production to retirement.
What it means
Over a product's life, a surprising amount of information accumulates: drawings, parts lists, test reports, supplier details, change records and customer approvals. PLM is about keeping that in one controlled place, with one current version and a clear history. In a small firm it may start as a disciplined folder structure with revision rules, and grow into a dedicated system only when the number of products justifies it.
Example
A Pune pump manufacturer with 40 models finds that three different drawings of the same impeller exist in different departments. It sets up one master folder per model with locked revisions and a change log, and from then on the shop floor prints only from that source.
Records and checks
- Record the current revision of each drawing, parts list and specification, and the history of changes.
- Verify regularly that production, purchasing and the vendors hold the current revision.
- The engineering head owns the master data; each department confirms it uses that version.
Common mistakes
- Buying a large system before the basic rules on revisions and approvals are agreed.
- Letting engineers keep private copies, so the master quickly goes out of date.