Power factor

Power factor is the ratio of real power in kW to apparent power in kVA, showing how effectively a site turns supplied current into useful work.

What it means

Motors, transformers and welding sets need extra current just to build magnetic fields, and this part does no work. A power factor of 1 means no such waste; 0.8 means that 20 percent of the capacity is occupied by non working current. Utilities may charge a penalty or give an incentive depending on the tariff. Capacitor banks are commonly fitted to raise it.

Example

A rolling unit in Raipur draws 160 kW at 200 kVA, so power factor is 160 divided by 200, which is 0.8. After fitting a capacitor bank, the same 160 kW needs only 168 kVA, a power factor of about 0.95.

Records and checks

  • Record monthly average power factor from the bill and the meter at different loads.
  • Verify capacitor banks are working by checking fuses, current and output regularly.
  • The electrical head reviews bills for power factor charges and the owner approves upgrades.

Common mistakes

  • Fitting a capacitor bank and never checking it, so a failed unit goes unnoticed.
  • Overcorrecting, which can cause its own problems on the supply.

Check the current rule on the official portal or with your CA before acting.