Preventive maintenance
Preventive maintenance is routine inspection, cleaning, lubrication and part replacement done at set intervals to reduce the chance of a machine failing.
What it means
Instead of waiting for a fault, the team services the machine by time or running hours: daily cleaning, monthly greasing, yearly overhaul. The intervals come from the maker's manual and the plant's own failure history. Done well, it lowers breakdowns, prolongs machine life and makes costs steadier. Done too often, it wastes labour and parts, so intervals need review.
Example
A garment unit oils and cleans each sewing machine every Saturday and replaces needles on a monthly plan. Breakdown stoppages fall from 14 to 5 a month, at a cost of ₹3,000 of extra parts and labour.
Records and checks
- Record the task, interval, date done, technician and any defect found.
- Verify completion against the schedule and review whether failures still occur between services.
- The maintenance supervisor assigns and signs off; the production head makes the machine available on time.
Common mistakes
- Skipping preventive tasks whenever orders are heavy, which is when breakdowns hurt most.
- Never reviewing intervals, so machines are over or under serviced.