Process window
A process window is the range of settings for a process, such as temperature, pressure and time, within which acceptable parts are made consistently.
What it means
Every process has limits. If the melt is too cool or the pressure too low, parts are short. If they are too high, flash or burns appear. The window is the area in between where parts are good. A wide window forgives small changes in material, weather or operator. A narrow window means the process is easily upset, which suggests problems with the mould, material or the part design.
Example
On a trial, a setter finds good parts between 215 and 235 °C melt temperature and between 70 and 100 bar injection pressure. The company sets production at the centre, 225 °C and 85 bar. On a hot day the melt rises by 5 degrees and parts are still good.
Records and checks
- Record the tested limits for each key setting, the settings found at each edge and the centre value chosen.
- Verify the window again after a material or mould change and when quality begins to drift.
- The process engineer runs the trials, the quality inspector judges the parts, and the production head approves the centre values.
Common mistakes
- Setting the process at the edge of the window, so a small change causes defects.
- Never testing the window, and so not knowing how close to trouble the job runs.