lamp.
ResourcesPricingAbout

Project scope

Project scope is the agreed definition of everything a project will deliver, including the work, quantities and quality, and also what is deliberately left out.

What it means

It is the boundary of the job. A clear scope lets you price accurately, plan resources and refuse extra work without argument. Where the scope is vague, clients assume more is included and contractors assume less, and disputes follow. Anything outside it should be treated as a change and priced separately, which is why scope is the first thing written down.

Example

A contractor quotes ₹5.5 lakh to renovate two bathrooms. The scope lists tiles, fixtures, plumbing and waterproofing, and excludes false ceilings, electrical rewiring and debris removal. When the client later wants a false ceiling, it is handled as an extra at ₹42,000.

Records and checks

  • Record: deliverables, quantities, specifications, exclusions, assumptions and the date the client accepted it.
  • Verify: that the scope matches the quotation, drawings and contract terms.
  • Checked by: the project manager confirms it with the client in writing before work begins.

Common mistakes

  • Listing what is included but not what is excluded.
  • Accepting small additions informally until the job is much bigger than priced.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →