Punching
Punching is a sheet metal process in which a punch is driven through the sheet into a matching die to cut out a hole or shape.
What it means
It is done on a hand press, a power press or a CNC turret punch that holds many tool shapes. For round holes, slots and repeat patterns, punching is faster than laser and gives low cost per hole in thin sheet. Each punch and die pair has a fixed clearance set by thickness and material.
Example
A switchgear maker needs 6,000 ventilation slots across 150 panels of 1.5 mm sheet. A CNC turret punch makes each slot in under a second, finishing the batch in about three hours.
Records and checks
- Record the tool station and size, sheet thickness, punch count and hits since the last tool sharpening.
- Verify the burr height and hole position on the first sheet, and at intervals during the run.
- The operator logs tool hits, and the supervisor schedules sharpening before burrs get large.
Common mistakes
- Using the wrong die clearance for the sheet thickness, which causes heavy burrs and early tool wear.
- Punching holes very near a bend line, where they stretch out of shape when bent.