Quality loss

Quality loss is the production time, material and cost wasted on pieces that are scrapped or need rework because they do not meet the required specification.

What it means

Every bad piece uses material, machine time and labour that earn nothing. In overall equipment effectiveness, quality loss is the share of total pieces that are not good on the first pass. Scrap is a complete loss. Reworked pieces are still a loss because the extra handling costs time and delays delivery.

Example

A stitching unit sews 1,000 shirts in a day. Forty have broken stitching and are unpicked and redone, and 20 are cut off as scrap at ₹250 each. First-pass quality is 94%, and the scrap alone costs ₹5,000 plus the rework hours.

Records and checks

  • Record accepted, reworked and scrapped quantities by product, machine, shift and defect type.
  • Verify quantities against inspection slips and the physical scrap bin before the day closes.
  • The quality inspector confirms the counts, and the owner reviews the cost weekly.

Common mistakes

  • Treating reworked pieces as good output, which makes quality look better than it is.
  • Writing off scrap in bulk at month end, so the defect cause cannot be traced to a shift or machine.