lamp.
ResourcesPricingAbout

Recipe card

A recipe card is the written standard for one dish, listing ingredients with exact quantities, the method, the yield, the portion size and the plating.

What it means

It lets different cooks produce the same taste and plate, and it is the source for costing and ordering. A good card also states preparation time, storage life, allergens and the cooking station. When an outlet or central kitchen produces at volume, cards are scaled by batch size. A change in ingredient or method should update the card, not stay in a cook's head.

Example

The card for a mutton biryani lists 1 kg meat, 800 g rice, spice quantities, 45 minutes dum time and a yield of 10 portions of 350 g. A new cook follows it on his first day and the plate matches the one served last week.

Records and checks

  • Record the dish, ingredients with quantities, method, yield, portion size, allergens and the version date.
  • Verify the card by test cooking and weighing before approval.
  • The head chef approves and updates cards, and the manager checks that the kitchen uses the current version.

Common mistakes

  • Leaving old cards in use after the recipe changes.
  • Listing ingredients in cups or handfuls instead of weights.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →