Rejection register
A rejection register is a running log of rejected pieces, recording the date, product, quantity, defect, cause and the action taken, kept so repeated problems can be seen and fixed.
What it means
It turns individual failures into a pattern. Each line notes what was rejected, how many, why, which machine and shift produced it, and what happened next: rework, concession or scrap. Reading it over a month shows which defect repeats and where. It is also the evidence you show a customer or auditor that rejections are being tracked and controlled.
Example
A foundry's register shows 14 of the 22 casting rejections in a month are blowholes, all from the Tuesday and Thursday night shift. A change in sand moisture checks cuts the blowholes to 3 the next month.
Records and checks
- Record the date, part number, lot, quantity, defect, suspected cause, machine, shift and disposal.
- Verify that the register total matches inspection reports and the scrap records.
- The quality in-charge keeps it, and the plant head reviews the top defects each month.
Common mistakes
- Writing the cause as "operator mistake" for every entry, which gives no actionable lead.
- Filling the register from memory days later, so counts and shifts are wrong.