Repair turnaround

Repair turnaround is the elapsed time from when a fault is reported, or an item is sent for repair, until it is back in working use.

What it means

It is the figure the production side cares about, as it includes waiting for the technician, parts and any outside workshop. For items sent away, such as motors or tools, it includes transport both ways. A clear turnaround target by priority, say 4 hours for critical faults and 3 days for minor ones, lets operators plan and holds the maintenance team to account.

Example

A motor winding fails and is sent to an outside rewinder on Monday. It returns on Friday, so turnaround is five days. The plant now keeps a spare motor to bridge the gap.

Records and checks

  • Record the date and time of the report, dispatch for repair, return and final restart.
  • Verify turnaround against the target by priority and review the late cases.
  • The maintenance supervisor tracks it; the purchase team follows up outside workshops.

Common mistakes

  • Measuring only workshop time and not counting waiting before and transport after.
  • Letting outside repairers give no date, so turnaround cannot be managed.