Risk matrix

A risk matrix is a grid that combines the likelihood of a harmful event with its severity to rate each hazard, so the team can rank what to fix first.

What it means

Most firms use a five by five grid, from rare to almost certain against minor to catastrophic. Multiplying the two numbers gives a score, coloured green, amber or red, and each colour has a rule such as "stop work" or "monitor". Every firm must define what each level means in its own terms.

Example

A warehouse in Bhiwandi scores a damaged rack as likelihood 4 and severity 4, giving 16 and a red rating. A loose floor mat scores 3 and 1, giving 3 and green. The rack is repaired this week, the mat at the next housekeeping round.

Records and checks

  • Record the scale definitions, the score for each hazard and the date scored.
  • Verify two people score the same hazard similarly, to catch personal bias.
  • The safety committee approves the matrix and reviews red items at fixed intervals.

Common mistakes

  • Leaving the words on the scale vague, so "likely" means different things to each scorer.
  • Treating a low score as permission to ignore a hazard that is cheap to fix.