lamp.
ResourcesPricingAbout

Safety data sheet

A safety data sheet is a document from a chemical's supplier that describes its hazards, safe handling, storage, first aid, firefighting and spill response.

What it means

Anyone who stores or uses a chemical, such as solvent, acid, paint, adhesive or cleaning agent, should have its sheet within reach. It tells you which gloves to wear, what not to store beside it, and what to do after a splash.

Example

A bakery equipment workshop in Kolkata buys a degreaser in 20-litre drums at ₹3,400 each. The sheet shows it must not be stored near oxidisers, so the stores team moves it to a separate rack and posts the sheet near the wash area.

Records and checks

  • Record a register of every chemical with its sheet, date of issue and storage location.
  • Verify the sheet is current and in a language the workers can read.
  • The stores in-charge keeps the register; the safety officer checks sheets match what is on the shelves.

Common mistakes

  • Keeping sheets locked in an office rather than near the point of use.
  • Not replacing the sheet when the supplier or formulation changes.

Check the current rule on the official portal or with your CA before acting.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →