SEC
SEC is short for specific energy consumption, the amount of energy a process uses to make one unit of output, such as kWh per tonne.
What it means
In energy reports, SEC is the figure that makes months and plants comparable. Total energy goes up when production goes up, so it cannot show efficiency by itself. Dividing energy by output removes that effect. A rising SEC with steady production means something is wasting power, such as leaks, idle running, a failing motor or a poor mix of products.
Example
A rice mill in Karnal used 36,000 kWh to process 900 tonnes in July, so SEC was 40 kWh per tonne. In August, it used 43,000 kWh for 960 tonnes, or about 44.8, so the owner looks for the cause.
Records and checks
- Record energy used and output for each period, using the same units every time.
- Verify the output figure is from the stores or dispatch record and not an estimate.
- The plant head reviews SEC monthly and the owner sets an annual target.
Common mistakes
- Changing the output unit between months, so the figures cannot be compared.
- Ignoring product mix, which can shift SEC without any change in efficiency.