Section weight
Section weight is the mass per unit length, normally kilograms per metre, of a standard steel profile such as an angle, channel, beam or tube.
What it means
Structural steel is sold by weight, but ordered by profile and length. Standard tables give the weight per metre for each section, and for a custom shape it is found from the cross-section area multiplied by the steel density. Fabricators multiply by the length to estimate tonnage for quotations, transport and crane selection.
Example
A shed contractor needs 180 m of 75 x 75 x 6 angle. If the standard weight is about 6.8 kg per metre, the angle weighs 1,224 kg. At ₹66 per kg, the material cost is about ₹80,800, before cutting loss and wastage.
Records and checks
- Record the section designation, length, theoretical weight and actual weighed weight.
- Verify the weight on a calibrated weighbridge and compare against the theoretical figure.
- The store keeper records the reading, and the estimator updates future quotes with the actual wastage seen.
Common mistakes
- Using weight from an old table or an imported standard that differs from the Indian section actually supplied.
- Forgetting that welded accessories, plates and paint add to the final shipping weight.