lamp.
ResourcesPricingAbout

Sheet metal

Sheet metal is metal rolled into thin, flat pieces, generally under about 3 mm thick, that can be cut, punched, bent and joined into panels, boxes and other parts.

What it means

Common sheet materials include mild steel (hot or cold rolled), galvanised steel, stainless steel and aluminium. Thickness is stated in millimetres or in gauge numbers, which can mean different thicknesses in different gauge systems, so millimetres are safer. Sheet metal work follows a sequence: cut or punch the flat shape, bend it, then weld or fasten it and finish the surface.

Example

An electrical panel maker orders 2 mm CRCA sheet for 80 cabinets. After laser cutting and bending the parts, it welds the corners, powder coats the cabinets and fits door locks, with each stage recorded against the job card.

Records and checks

  • Record the material type, thickness in mm, sheet size, finish and the lot or coil number.
  • Verify thickness and flatness on receipt, and surface condition if the part will be coated.
  • The store inspector checks at receipt, and the production planner allocates sheets by job.

Common mistakes

  • Ordering by gauge number without confirming the millimetre thickness.
  • Ignoring the rolling direction when bending, which causes cracks on thin or hard grades.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →