Statistical process control
Statistical process control is a method of monitoring a process through sampled measurements and control charts, to distinguish normal variation from changes that need action.
What it means
Every process varies a little. The method separates that natural variation from signals of a real problem, such as tool wear, a new material lot or a changed setting. Control limits are calculated from data, not from the specification. Used well, it lets a firm correct the process early.
Example
A bottled-water plant tracks the fill volume of 5 bottles every 30 minutes. Over a shift, the readings stay between 996 and 1,004 ml, within limits. After lunch, three successive points fall below the centre line. The filler head is cleaned and the average returns, with no bottle below the declared quantity.
Records and checks
- Record the characteristic, sample size, frequency, chart type, limits and the actions on signals.
- Verify that people are trained in reading the chart and that the measuring method is consistent.
- The quality engineer sets up and audits the charts, and operators maintain them.
Common mistakes
- Recalculating control limits after every bad point, so the chart never signals.
- Applying charts to every characteristic instead of the few that matter most.