Steel density

Steel density is the mass of steel per unit volume, commonly taken as about 7,850 kilograms per cubic metre or 7.85 grams per cubic centimetre.

What it means

Knowing the density lets you convert a drawing into weight, and weight into material cost. For a plate, weight is length times width times thickness times density. The value is slightly different for stainless steel, which is a little heavier, and for other alloys. Estimators use it for quotations, and stores use it to cross-check delivery weights.

Example

A plate of 1,000 x 500 x 10 mm has a volume of 5,000,000 cubic mm, or 0.005 cubic metres. Multiplied by 7,850, it weighs about 39.3 kg. At ₹65 per kg, the plate costs about ₹2,550.

Records and checks

  • Record the density value used in the estimate and the steel grade it was taken for.
  • Verify the calculated weight against the actual weighed weight on receipt and note any difference.
  • The estimator sets the figure, and the store keeper reports weight differences beyond normal tolerance.

Common mistakes

  • Using one density for all metals, so aluminium or stainless estimates come out wrong.
  • Mixing up units, such as mm dimensions with a density in kilograms per cubic metre.