Store inventory
Store inventory is the stock of goods held by a retail store at a given time, on display or in its backroom.
What it means
It is the main asset a shop owns and often its largest cost. The store's inventory figure is usually reported in quantity and in rupee value at cost. It must be balanced between too little, which loses sales, and too much, which ties up cash and risks damage, expiry or going out of fashion. It is checked against sales to see how many days of stock the shop holds.
Example
A electronics accessories shop holds ₹9 lakh of stock at cost and sells ₹1.5 lakh of goods at cost each month. That is about six months of stock, which is too high for fast-changing phone covers. The owner stops reordering slow lines and aims for two months' stock, releasing roughly ₹6 lakh of cash.
Records and checks
- Record each item's quantity, cost, selling price, location and the date it was received.
- Verify the stock figure against a physical count at set intervals.
- The store manager maintains it, and the owner reviews the stock value and ageing monthly.
Common mistakes
- Valuing stock at selling price instead of cost.
- Ignoring slow items and expired goods in the stock figure.