lamp.
ResourcesPricingAbout

Submetering

Submetering is the use of additional meters downstream of the main utility meter to measure the energy or water used by a section, machine or tenant.

What it means

The utility meter gives one total. Submeters break it up, so you can see which department or machine is behind the bill and charge costs fairly. They are used to bill tenants in a shared building, to find waste and to measure the effect of an improvement. The sum of submeters should be close to the main meter, with the gap showing unmetered loads or losses.

Example

A three storey factory building in Thane has one connection shared by two tenants and the owner's unit. After installing submeters, each tenant is billed for its own units, and the owner sees that common lighting and lift use 8 percent of the total.

Records and checks

  • Record each submeter's location, number, multiplying factor and its reading at each cycle.
  • Verify that the total of submeters is close to the main meter's reading, and look into big differences.
  • The accountant bills from readings, and the owner keeps a copy of the tenant agreement on the billing rate.

Common mistakes

  • Installing submeters but taking readings only occasionally.
  • Billing tenants at a rate that differs from the agreement without informing them.

Check the current rule on the official portal or with your CA before acting.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →