Surface preparation

Surface preparation is the cleaning and conditioning of a metal surface, by degreasing, grinding, blasting or chemical treatment, before coating, plating or bonding.

What it means

Most coating failures start with poor preparation, not poor paint. Steps depend on the part and the coating: oil and grease are removed with solvent or alkaline wash, rust and scale by blasting or acid treatment, and weld spatter and sharp edges by grinding. The surface is then coated promptly, before it can oxidise again.

Example

A fabricator of storage racks degreases 500 shelves, bead blasts them and applies phosphate treatment before powder coating. Racks from an earlier lot, painted over oily surfaces, began peeling within three months and were taken back for recoating.

Records and checks

  • Record the cleaning method, chemical or abrasive used, bath condition, time and the part lot.
  • Verify the surface visually, with a water-break test for oil, and by the cleanliness grade the customer specified.
  • The coating supervisor accepts the surface before coating, and the quality inspector samples the finished lot.

Common mistakes

  • Painting over mill scale, oil or weld spatter because the surface looks clean enough.
  • Letting prepared parts wait overnight uncovered before coating.