Target
A target is a specific, measurable level of performance, with a date or period, that a person or team is aiming to reach.
What it means
A good target names the measure, the level and the time, such as "reduce scrap from 5 percent to 3 percent by 31 March". It should be challenging but within reach, and the person responsible should have control over the result. It must be tied to a baseline, or no one can tell how big the stretch is.
Example
A tool room reports 14 percent of jobs delivered late. The owner sets a target of 6 percent late within two quarters, and assigns the planner to review overdue jobs every Monday and report progress in a short meeting.
Records and checks
- Record the measure, baseline, target level, the date and the person responsible.
- Verify that the measure is tracked regularly and that the target is reviewed if conditions change.
- The owner sets it with the team, and the manager reviews progress monthly.
Common mistakes
- Setting a target with no baseline or deadline, so success cannot be judged.
- Setting a target on something the team cannot influence.