Task run
A task run is a single recorded execution of a task by an agent, from its starting input through each step to its final result or failure.
What it means
The same task, say matching supplier bills, runs many times. Each time is a separate run with its own start, inputs, steps, outputs and outcome. Separate records let you answer later: what happened to this bill, why was it held, who approved it. They also let you count failures and find slow steps. A run that cannot be traced cannot be defended in a dispute.
Example
On 5 November an agent processes 42 bills in one run. The run record shows 38 matched, 3 held for missing receipts and 1 failed on an unreadable scan, with times for each.
Records and checks
- Record run identifier, start and end time, inputs, steps and final status.
- Verify that every failed run has an owner and a reason noted.
- The process owner reviews run counts, failure rates and long-running items weekly.
Common mistakes
- Overwriting a run record on retry, which destroys the history of what failed first.
- Logging only the final result and not the steps that led to it.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →