Technical specification

A technical specification is a detailed document that states exactly what a product, material or service must be, including dimensions, grades, tolerances, finishes and acceptance tests.

What it means

It is the document that lets a supplier make the right thing, and lets a receiving inspector decide whether what arrived is acceptable. It names standards, material grades, limits and test methods. It is more detailed than a requirements list and leaves less room for interpretation. A good one gives only what matters to the function, avoiding limits stricter than the use requires, because those raise cost without benefit.

Example

A Sangli sugar mill buys conveyor belts. Its specification gives belt width of 600 mm, 4-ply fabric, top cover of 5 mm abrasion-resistant rubber, minimum tensile strength per ply, and a test certificate with each roll. When a trader supplies a 3-ply belt, the receiving inspector rejects it against the written specification.

Records and checks

  • Record the item, revision, key limits, referenced standards, test methods and approval.
  • Verify that purchase orders carry the current specification and receiving inspectors have it.
  • The engineering or technical head approves; purchasing sends it to vendors and stores checks goods against it.

Common mistakes

  • Quoting only a brand name, so an equivalent product cannot be judged.
  • Copying tight tolerances from another part, raising the price with no functional benefit.