Tool trial
A tool trial is a test run of a new, modified or repaired mould, die or tool, used to check the parts it makes and to find corrections before production begins.
What it means
New tools rarely work perfectly the first time. A trial mounts the tool, runs it with the chosen material and measures sample parts against the drawing. Findings such as short fill, flash, warpage, wrong dimensions or poor ejection are listed and sent to the toolmaker for correction. Several trials may be needed before the buyer approves a first sample and the tool is released for production.
Example
A packaging firm gets a new 2-cavity cap mould. At the first trial the caps are short on thread and slightly warped. The toolmaker adjusts the venting and cooling, and the second trial passes dimension checks. The buyer approves the sample, and the mould is released with the settings recorded.
Records and checks
- Record the trial date, the tool, machine, material, settings, the defects found and the corrections requested.
- Verify sample dimensions against the drawing and keep the approved samples with the tool record.
- The toolmaker corrects, the quality inspector measures, and the buyer or production head approves the release.
Common mistakes
- Starting production on a tool that never had a documented trial.
- Not saving the settings that gave good parts, so the next setter starts again.