Vehicle capacity
Vehicle capacity is the maximum weight, and also the usable space, that a vehicle can carry safely and within its permitted limits.
What it means
It has two limits: weight, set by the vehicle's rated load, and volume, set by the size of the load body. Whichever is reached first limits the load. Dense goods such as steel hit the weight limit; light goods such as pillows fill the space long before. Planners use it to decide which vehicle to send.
Example
A 19-foot container truck has a rated capacity of 7 tonnes and about 30 cubic metres of space. A load of 400 cartons of foam is only 2 tonnes, but takes 31 cubic metres, so the volume limit forces a second vehicle.
Records and checks
- Record each vehicle's rated weight and body dimensions from its documents.
- Verify planned load weight and volume against both limits before hiring or dispatching.
- The dispatch planner checks the plan; the loading supervisor confirms the physical load.
Common mistakes
- Looking at only the tonnage and overlooking space, or the reverse.
- Trusting a transporter's verbal claim of capacity without seeing the vehicle's documents.
Check the current rule on the official portal or with your CA before acting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →