lamp.
ResourcesPricingAbout

Work instruction

A work instruction is a detailed, step-by-step guide to performing one specific task or operation, such as setting up a machine or packing an item correctly.

What it means

A standard operating procedure describes a whole process and who does what; a work instruction explains exactly how one worker does one step. It often includes settings, tools, quality limits, photos or drawings. It is placed at the workstation and used for training and for checking that work is done the same way on every shift.

Example

At a bottle-cap unit, a work instruction for the capping machine states the pressure setting, the torque range, how to check ten caps at the start of each shift, and when to stop and call maintenance. A photo shows a correctly sealed cap.

Records and checks

  • Record: task, steps, settings and limits, tools, safety points, version, approver and date.
  • Verify: by observation that the operator follows the steps and that settings match the instruction.
  • Checked by: the supervisor audits regularly; quality or the process owner approves each change.

Common mistakes

  • Keeping it in an office file instead of at the workstation.
  • Writing steps from memory without trying them on the machine.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →