lamp.
ResourcesPricingAbout

Yield

Yield is the quantity of good, usable output obtained from a given quantity of input material or process, normally shown as a percentage of the input.

What it means

A process that starts with 1,000 kg of raw material and ends with 920 kg of acceptable product has a yield of 92 percent. The gap is made up of scrap, spillage, evaporation, trimming or rejects. Yield matters most where material is the largest cost, such as food, chemicals, castings and textiles.

Example

A dal mill cleans and polishes 10,000 kg of raw toor and packs 8,700 kg of finished dal. The yield is 87 percent. If purchase cost is ₹110 per kg, each lost percentage point is worth about ₹11,000 on that lot.

Records and checks

  • Record the input weight, good output weight, by-products and the rejects with reasons for each lot.
  • Verify weighbridge or scale readings and that by-products are not counted twice as output.
  • The production head checks lot yield daily, and the owner compares yield across suppliers.

Common mistakes

  • Counting rework or downgraded pieces as good output, which inflates yield.
  • Comparing yield between different raw material grades as though they were the same.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →