lamp.
ResourcesPricingAbout
Process fixes4 min readIllustrative exampleAuto componentsabout 110 people

Agreeing on rejections before the debit note arrives

An illustrative account of asking the customer to share rejection details within 48 hours.

This story shows a practical response to asking the customer to share rejection details within 48 hours.

Before

A written rule changes the choice: suspect material stays on hold until authorised quality release. The difficulty is applying the rule to real exceptions. The routine depends on the QC inspector knowing which call, slip or instruction matters. Records exist in drawing, lot number, test report, complaints and inspection sample, but another person cannot reliably reconstruct the decision. This is the problem behind agreeing on rejections before the debit note arrives.

A request arrives and somebody responds to the loudest part first. The original source is left in a folder or WhatsApp chat. Later, when the quality manager needs to review it, people reconstruct what happened from memory. The missing piece is often lot identity, drawing revision, actual reading, inspection stage and containment area. By the time it is found, another person has already acted on an assumption.

The cost is visible as interrupted work, repeated checking or a promise that needs correcting. No saving or improvement figure is claimed here. The point is to change one repeatable action so that the next case can be handled without a chain of calls.

Why it was like that

The previous method relies on informal permission and experience. Staff may understand the right thing to do, but not where to record it or who can approve an exception. Adding a shared spreadsheet without clarifying authority would leave the same bottleneck in place.

In this example, the control that is missing is suspect material stays on hold until authorised quality release. An urgent request can legitimately break the normal rule. The exception still needs a named decision-maker, a reason and a source reference. Otherwise the exception becomes the usual way of working.

The change

The replacement is a one-page inspection and corrective action register. Ask for reject count, condition and invoice reference. This is the required check before an instruction moves to the next person. Jointly agree what is under review. Finally, avoid blind debit adjustment. Each line retains the evidence needed if the decision is challenged later.

Copyable rule for this team

Example register rows, for illustration only:

Job / itemQuantity (example)Check requiredStatusDecision owner
S053-A33Ask for reject count, condition and invoice referenceOpenQC inspector
S053-B36jointly agree what is under reviewNeeds proofquality manager

The owner can set a sample limit, but it should be based on actual financial exposure, not copied from another firm. A rule that touches statutory dues, credit, worker pay or electrical safety also needs a qualified reviewer.

After

In the revised composite routine, the first person records the incoming request once. Another team member can see its source, status and next action without recontacting everybody. The quality manager sees only the cases needing judgement. Routine cases move under written delegated authority.

For the specific case in this article, the first visible change is ask for reject count, condition and invoice reference. The next person can then jointly agree what is under review. At the end, avoid blind debit adjustment. That sequence matters because each part leaves a record that the next role can verify.

A weekly check samples a few entries rather than trusting the tick column. The manager looks for cases marked closed without supporting evidence, repeat exceptions and requests that still depend on the owner. Those are reasons to revise the rule.

What to watch out for

  • Staff may start filling the register after the event. Check the time and reference against the source.
  • The authorised manager may approve an exception by phone and forget to record it. Ask for the decision to be added to the same entry.
  • The team may treat every request as urgent. Compare actual deadlines and commercial or safety effects before changing priority.

Do not replace a rejected batch before checking what other lots may share the same cause.

Copy it

Use the table above as a starting point. Replace the example entries with two current cases. Mark unclear evidence as Open, then name the next person to check it. Keep the source record, owner, next review date and reason for any override. An example exposure of ₹2,40,000 or 33 units is illustrative only; set limits from your own business records.

Start with Complaint register. If you need the full sequence, use Logging customer complaint. Measure open exceptions and missed commitments for four reviews before deciding whether the change holds.


Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →