Counting rework as a rejection
An illustrative account of rework is logged like a rejection, so the true cost shows.
This story shows a practical response to rework is logged like a rejection, so the true cost shows.
Before
One missing entry exposes a risk: bad parts move to the next stage while the cause remains unverified. The records exist, but they disagree at the point of decision. The routine depends on the QC inspector knowing which call, slip or instruction matters. Records exist in drawing, lot number, test report, complaints and inspection sample, but another person cannot reliably reconstruct the decision. This is the problem behind counting rework as a rejection.
A request arrives and somebody responds to the loudest part first. The original source is left in a folder or WhatsApp chat. Later, when the quality manager needs to review it, people reconstruct what happened from memory. The missing piece is often lot identity, drawing revision, actual reading, inspection stage and containment area. By the time it is found, another person has already acted on an assumption.
The cost is visible as interrupted work, repeated checking or a promise that needs correcting. No saving or improvement figure is claimed here. The point is to change one repeatable action so that the next case can be handled without a chain of calls.
Why it was like that
The previous method relies on informal permission and experience. Staff may understand the right thing to do, but not where to record it or who can approve an exception. Adding a shared spreadsheet without clarifying authority would leave the same bottleneck in place.
In this example, the control that is missing is suspect material stays on hold until authorised quality release. An urgent request can legitimately break the normal rule. The exception still needs a named decision-maker, a reason and a source reference. Otherwise the exception becomes the usual way of working.
The change
The replacement is a one-page inspection and corrective action register. Log reworked pieces and minutes alongside scrap. This is the required check before an instruction moves to the next person. Reconcile output. Finally, examine the highest-cost cause. Each line retains the evidence needed if the decision is challenged later.
Copyable rule for this team
Example register rows, for illustration only:
| Job / item | Quantity (example) | Check required | Status | Decision owner |
|---|---|---|---|---|
| S067-A | 33 | Log reworked pieces and minutes alongside scrap | Open | QC inspector |
| S067-B | 36 | reconcile output | Needs proof | quality manager |
The owner can set a sample limit, but it should be based on actual financial exposure, not copied from another firm. A rule that touches statutory dues, credit, worker pay or electrical safety also needs a qualified reviewer.
After
In the revised composite routine, the first person records the incoming request once. Another team member can see its source, status and next action without recontacting everybody. The quality manager sees only the cases needing judgement. Routine cases move under written delegated authority.
For the specific case in this article, the first visible change is log reworked pieces and minutes alongside scrap. The next person can then reconcile output. At the end, examine the highest-cost cause. That sequence matters because each part leaves a record that the next role can verify.
A weekly check samples a few entries rather than trusting the tick column. The manager looks for cases marked closed without supporting evidence, repeat exceptions and requests that still depend on the owner. Those are reasons to revise the rule.
What to watch out for
- Staff may start filling the register after the event. Check the time and reference against the source.
- The authorised manager may approve an exception by phone and forget to record it. Ask for the decision to be added to the same entry.
- The team may treat every request as urgent. Compare actual deadlines and commercial or safety effects before changing priority.
Do not replace a rejected batch before checking what other lots may share the same cause.
Copy it
Use the table above as a starting point. Replace the example entries with two current cases. Mark unclear evidence as Open, then name the next person to check it. Keep the source record, owner, next review date and reason for any override. An example exposure of ₹2,40,000 or 33 units is illustrative only; set limits from your own business records.
Start with Rejection cost calculator. If you need the full sequence, use Quality issue to closure. Measure open exceptions and missed commitments for four reviews before deciding whether the change holds.
Read next
- Rework not counted
- Quality issue to closure
- Rejection cost calculator
