lamp.
ResourcesPricingAbout
Real businesses4 min readIllustrative exampleFMCG distributionabout 20 people

How a distributor handles goods damaged in transit

An illustrative account of photos at loading and unloading, and a note on the lr.

This story shows a practical response to photos at loading and unloading, and a note on the lr.

The business

This composite concerns a fmcg distribution business with about 20 people. Field collections, high order frequency and returned goods require daily matching between sales and accounts. The site supervisor manages the daily safety work. The safety lead or owner is called when a commitment changes or a decision exceeds normal authority.

Records may be spread across first-hand report, photos where appropriate, attendance register and inspection notes. This story centres on this recurring task: photos at loading and unloading, and a note on the lr.

What was going wrong

A written rule changes the choice: protect people first and preserve relevant evidence before restarting the area. The difficulty is applying the rule to real exceptions. The team can usually explain the situation after several calls. That explanation is rarely attached to the document that the next shift or the customer sees. In this case, the important missing link is photograph package condition at both hand-offs. It is not enough to know that someone spoke about it.

The second problem is timing. When an unsafe condition remains active while people debate who caused it, the check happens too late to change the next commitment.

What they changed

The team would start by giving one person responsibility for the incident and action log. Its first rule is simple: Protect people first and preserve relevant evidence before restarting the area. Staff can still make calls and use WhatsApp, but the approved reference and the reply return to that record. One owner keeps the entry current, and another person handles decisions outside the routine limit.

For this particular problem, the operating instructions are concrete:

  1. First check: Photograph package condition at both hand-offs. Keep a reference to the source rather than a summary from memory.
  2. Next action: Annotate delivery note. Add the responsible role and the time the next answer is needed.
  3. Decision point: Retain carrier claim documents. Do not quietly replace an old promise or technical record.

The team can copy this small register. Both entries below are illustrative examples, not records of a real business.

RecordEvidence to findResponsible roleDue pointStatus
S038-01dated incident record, witness account and action closure proofsite supervisorBefore releaseOpen
S038-02annotate delivery notesafety lead or ownerWeekly reviewCheck

At the end of the review, anything still uncertain stays open. The next person should be able to find the original source, understand which part is confirmed and see who is expected to act. If an approval involves price, safety or compliance, the authorised manager makes that decision.

What a normal morning looks like now

The site supervisor opens the incident and action log alongside first-hand report, photos where appropriate, attendance register and inspection notes. They look first for work promised today and then for items missing an owner or proof. The safety lead or owner does not need the complete history retold. Only the exceptions, their business effect and the requested decisions reach that desk.

A useful meeting ends with the reference, next action and date written down. The team checks the same list later rather than asking each department for a fresh verbal status. For injury, fire or electrical incidents, follow the site emergency plan and call qualified emergency responders when needed.

What did not work at first

A likely first attempt is adding more columns or asking everybody to update another report. People then spend time copying entries from their own registers. A second attempt is to mark cases closed after a reassuring phone call. Neither establishes whether the underlying goods, amount or instruction has been checked.

The simpler practice keeps the original reference and records only what has changed. A disputed entry remains disputed. If the team cannot find evidence, it names the person who can, and sets a time for the next check.

What is still not solved

A register cannot remove a material shortage, a customer's disagreement or a long outside lead time. It can expose the risk early enough for a person to decide. This story does not claim an achieved saving, improved margin or shorter delivery time. The useful outcome to measure would be fewer unowned exceptions and a clear record of decisions.

If you want to try this

  1. Open Material damaged in transit and choose one live case matching this story. Identify the exact trigger and finish condition.
  2. Copy the fields from Transporter scorecard. Enter the source, one responsible person, the next check and its date. Use actual records, not the example figures here.
  3. At the next review, compare the register with the physical or financial evidence. If the same gap returns, revisit Proof of delivery missing and change the control at that point.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →