Putting a piece target on every machine
An illustrative account of targets set from realistic cycle times, agreed with operators.
This story shows a practical response to targets set from realistic cycle times, agreed with operators.
Before
While checking the register, the production supervisor is dealing with an urgent order. The immediate problem concerns targets set from realistic cycle times, agreed with operators. The routine depends on the production supervisor knowing which call, slip or instruction matters. Records exist in confirmed orders, machine availability, stores position and shift output sheets, but another person cannot reliably reconstruct the decision. This is the problem behind putting a piece target on every machine.
A request arrives and somebody responds to the loudest part first. The original source is left in a folder or WhatsApp chat. Later, when the production manager needs to review it, people reconstruct what happened from memory. The missing piece is often material ready, machine slot, tools, drawing revision and orders already promised. By the time it is found, another person has already acted on an assumption.
The cost is visible as interrupted work, repeated checking or a promise that needs correcting. No saving or improvement figure is claimed here. The point is to change one repeatable action so that the next case can be handled without a chain of calls.
Why it was like that
The previous method relies on informal permission and experience. Staff may understand the right thing to do, but not where to record it or who can approve an exception. Adding a shared spreadsheet without clarifying authority would leave the same bottleneck in place.
In this example, the control that is missing is any rush insertion names the work it will displace. An urgent request can legitimately break the normal rule. The exception still needs a named decision-maker, a reason and a source reference. Otherwise the exception becomes the usual way of working.
The change
The replacement is a one-page production plan and job card board. Set pieces using observed cycle time and breaks. This is the required check before an instruction moves to the next person. Agree target with operators. Finally, measure reason for shortfall. Each line retains the evidence needed if the decision is challenged later.
Copyable rule for this team
Example register rows, for illustration only:
| Job / item | Quantity (example) | Check required | Status | Decision owner |
|---|---|---|---|---|
| S065-A | 17 | Set pieces using observed cycle time and breaks | Open | production supervisor |
| S065-B | 20 | agree target with operators | Needs proof | production manager |
The owner can set a sample limit, but it should be based on actual financial exposure, not copied from another firm. A rule that touches statutory dues, credit, worker pay or electrical safety also needs a qualified reviewer.
After
In the revised composite routine, the first person records the incoming request once. Another team member can see its source, status and next action without recontacting everybody. The production manager sees only the cases needing judgement. Routine cases move under written delegated authority.
For the specific case in this article, the first visible change is set pieces using observed cycle time and breaks. The next person can then agree target with operators. At the end, measure reason for shortfall. That sequence matters because each part leaves a record that the next role can verify.
A weekly check samples a few entries rather than trusting the tick column. The manager looks for cases marked closed without supporting evidence, repeat exceptions and requests that still depend on the owner. Those are reasons to revise the rule.
What to watch out for
- Staff may start filling the register after the event. Check the time and reference against the source.
- The authorised manager may approve an exception by phone and forget to record it. Ask for the decision to be added to the same entry.
- The team may treat every request as urgent. Compare actual deadlines and commercial or safety effects before changing priority.
A plan must reserve time for changeovers and rework. A full machine calendar does not mean a realistic plan.
Copy it
Use the table above as a starting point. Replace the example entries with two current cases. Mark unclear evidence as Open, then name the next person to check it. Keep the source record, owner, next review date and reason for any override. An example exposure of ₹1,26,000 or 17 units is illustrative only; set limits from your own business records.
Start with Department weekly scorecard. If you need the full sequence, use Setting shift targets. Measure open exceptions and missed commitments for four reviews before deciding whether the change holds.