Operator stories
What a production supervisor needs at shift handover
One sheet per machine, signed by both supervisors.
What goes on the sheet
- Job running and quantity done
- Problems seen: noise, rejections, tool wear
- Material needed for the next shift
- Open actions and who owns them
