Freight costs more than we planned
Compare quoted freight with actual transporter bills on ten orders. Use what you find to change the way this work is handled this week.
A gap in the day-to-day record can be easy to miss. Freight not included in quotes, or trucks sent half empty. The risk grows when teams use different versions of what was agreed.
What it looks like
- The dispatch coordinator has to search the dispatch plan and gate register before answering a routine question.
- Freight not included in quotes, or trucks sent half empty.
- Staff cannot locate the invoice, packing list, transporter LR or delivery proof for the latest case.
- People spot the gap after a customer cannot verify what was sent or when.
- The open case has no documented owner, due date or proof of closure.
Why it happens
The specific failure is left unchecked. Freight not included in quotes, or trucks sent half empty. If there is no recorded owner for that condition, the effect travels to the next team.
The work and its evidence move separately. Finished stock, packing readiness, billing and transport booking have separate owners and cut-off times.
A later hand-off exposes the gap. An internal ready status may refer to production completion only and omit paperwork, inspection or vehicle readiness.
The less obvious cause: A control may exist on paper but still fail in practice. Test whether someone actually performs this check: check vehicle fill, route choice, returns and detention charges.
Find the first failed hand-off before changing staff targets. A completed register alone cannot prove that physical work happened.
What to check first
- Compare quoted freight with actual transporter bills on ten orders. Compare dates, quantities and references. Mark an unconfirmed difference as unverified. Finish the first pass in under 30 minutes and name the missing source if needed.
- Check vehicle fill, route choice, returns and detention charges. Record the affected item or party and the person who can verify the detail. Finish the first pass in under 30 minutes and name the missing source if needed.
- Separate special dispatch requests from regular service. Mark each exception open, waiting for evidence or resolved, with a named next owner. Finish the first pass in under 30 minutes and name the missing source if needed.
How to fix it
- Start with one live case. Compare quoted freight with actual transporter bills on ten orders. Keep the source reference before changing the record.
- Make the control explicit. Show expected freight on quotation and dispatch approval. Put the rule in the register or sheet that staff already use.
- Set a second guardrail. Review costly routes and low-load departures monthly. Match customer, item, quantity, invoice and physical cartons before releasing a vehicle. Do not bypass statutory documents.
- Assign the next decision. The dispatch coordinator records the action and its due date. A separately authorised person signs off changes affecting money, safety or customer terms.
- Review the open list. Start with items affecting today or tomorrow. Keep third-party commitments separate from completed actions.
- Check whether the rule holds. For four weeks, count loads held after readiness or delivery balances not acknowledged. Reopen repeat cases and identify where the control failed.
Copy this dispatch readiness and exception sheet into a register or sheet:
| Reference / item | What went wrong | Evidence checked | Action owner | Promised date | Status / decision |
|---|---|---|---|---|---|
| P079 (example) | freight costs too high | Compare quoted freight with actual transporter bills on ten order | Dispatch coordinator | Set at review | Open |
Retain the source reference and limit access to authorised staff.
A worked example
Illustrative example only. A ₹95,000 shipment carries ₹13,000 freight against ₹7,000 quoted. Start by locating the source that would verify these amounts or quantities. The dispatch coordinator records the exact exception, gives it an owner and checks the next relevant event. This example shows how to structure the decision. It does not claim that a business achieved a saving or avoided a loss.
How you know it is fixed
- Completeness: Count loads held after readiness or delivery balances not acknowledged at the same time every week. Record the count and the oldest item, rather than just saying things are better.
- Timeliness: Check whether the assigned person took the next action before the agreed cut-off. Keep missed dates visible instead of replacing them silently.
- Proof of closure: Sample three closed cases and locate the invoice, packing list, transporter LR or delivery proof. A tick without supporting evidence is still an open control gap.
When it is more serious
Freight overruns repeatedly turn profitable orders loss-making. Hold irreversible decisions until the material facts are verified. For contracts, tax, wages or legal rights, retain source documents and consult a qualified adviser. Repeated exceptions after four reviews may require changing the control.
This works if someone does it every day. In most businesses, that someone is you.
Questions people ask
What should we check before taking action?
Compare quoted freight with actual transporter bills on ten orders. Keep its date and reference. Then compare it with the invoice, packing list, transporter LR or delivery proof; if they disagree, record the difference before changing either one.
Who should own the next action?
The dispatch coordinator should own the open item. The person authorised to change money, a technical standard or a customer commitment must still approve that decision.
Can we run this control without new software?
No. Start with a shared sheet or register containing the reference, owner, promised date, status and evidence. Once those fields are reliable, decide whether a system connection is worth setting up.
When is the issue serious enough to escalate?
Freight overruns repeatedly turn profitable orders loss-making. Keep supporting records and get specialist help where relevant.