Incident-to-closure: control and audit worksheet

This worksheet lets a safety lead or owner test whether incidents and near misses are really handled the way your procedure says. You take a sample of cases, compare each control with the paperwork and write down what is missing. It suits factories, godowns, clinics, salons and service firms where a person can be hurt or property damaged.

When to use it

Run it every month on a small sample, and again after any injury, fire, spill or repeated near miss. It is also useful before an insurer, customer or inspector asks to see your records. Where a case involved a reportable event, a claim or a filing, verify that separately. Check the current rule on the official portal or with your CA before acting.

The template

ControlWhat the reviewer checksEvidence to look atReviewer
Incident recordedDate, time, place, people involved and what happened, written the same dayIncident reportSite supervisor
People protectedArea made safe and medical help noted before investigation beganReport notes, first aid logSafety lead
Evidence keptPhotographs, witness names and the equipment or batch involvedPhoto folder, witness notesSafety lead
Cause and actionsA cause is written and every action has a named owner and dateAction listOwner
Reporting and claimsAny required report or insurance claim was checked and acknowledgedAcknowledgement copy, claim numberSite supervisor
Closure verifiedEach action was confirmed done by someone other than the action ownerClosure recordSafety lead

Findings sheet:

Sample incidentControl testedResultGap foundCorrective actionOwnerDue date
Met / Partly met / Not met

How to fill it

  • Sample incident: pick cases from different weeks, including near misses and at least one still open.
  • What the reviewer checks: look at the record itself. A verbal assurance is not evidence.
  • Result: Met, Partly met or Not met. Partly met needs a line in the gap column.
  • Corrective action: one task with a person and a date. "Be more careful" is not an action.
  • Reviewer: should not be the person who handled the incident.

Example row

Sample incidentControl testedResultGap foundCorrective actionOwnerDue date
INC-031Closure verifiedNot metGuard repair on a press, cost ₹7,800, marked done but not inspectedSafety lead inspects the guard and signs the closure recordSafety lead12 December

Review and sign-off

  • The owner or a senior person who did not handle the sampled incidents signs the worksheet.
  • Run it monthly, and within a week of any injury or repeated near miss.
  • Escalate to the owner immediately if an injury has no record, a required report is unverified, or an action is overdue on a serious hazard.

Keeping it up to date

  • Add a control when an incident exposes a step you did not check.
  • Carry unresolved findings forward to the next worksheet until they are closed.
  • Keep the worksheets and evidence for the period your CA or the law requires.