Incident-to-closure: role and approval matrix
This matrix says who does what, and who signs off, at each step of handling an accident or near miss. An owner or safety lead uses it so that nobody investigates their own case, nobody closes an action they were given, and a serious event always reaches the person who must decide. It fits workshops, warehouses, clinics and service businesses alike.
When to use it
Prepare it before the next incident, not during one. Revisit it when a supervisor or safety lead changes, when you add a shift or a site, and when an incident showed that nobody knew who should decide.
The template
| Step or decision | Prepares | Approves | Proof required | If rejected or sent back |
|---|---|---|---|---|
| Record the incident or near miss | Site supervisor | Safety lead | Incident report, same day | Supervisor completes missing facts within a day |
| Protect people and start investigation | Safety lead | Owner for serious cases | Photographs, witness notes | Investigation widened to more witnesses |
| Assign actions and review cause | Safety lead | Owner | Action list with owners and dates | Actions redrafted and reissued |
| Check any report or claim | Site supervisor | Owner, with your CA where needed | Acknowledgement or claim number | Case held open until verified |
| Spend on repairs or replacement | Site supervisor | Owner above the set limit | Quote or bill | Cheaper or phased option considered |
| Confirm each action and close | Action owner | Safety lead | Closure record with photo or inspection note | Case reopened with a new date |
Limits and backups:
| Role | Backup when absent | Spending limit (₹) | Valid from |
|---|---|---|---|
How to fill it
- Prepares: the person who writes the record. They cannot approve the same step.
- Approves: one named role. For serious cases, the owner must be informed the same day.
- Proof required: the document the approver must actually see.
- If rejected or sent back: what happens next, and by when.
- Spending limit: write a rupee figure per role so urgent repairs are not delayed.
- For the report or claim step: Check the current rule on the official portal or with your CA before acting.
Example row
| Step or decision | Prepares | Approves | Proof required | If rejected or sent back |
|---|---|---|---|---|
| Spend ₹7,800 to repair a press guard | Site supervisor | Owner, because it is above the ₹5,000 supervisor limit | Quote dated 6 November | Supervisor gets a second quote within two days |
Review and sign-off
- The owner signs the matrix and each version change.
- Review it every six months, and after any incident that exposed unclear authority.
- Escalate to the owner when an approver is unavailable and a hazard remains, or when two roles disagree about closure.
Keeping it up to date
- Record the version date and withdraw old copies.
- Test the backups by asking who would sign if the main approver were away tomorrow.
- Keep old versions for the period your CA or the law requires.