lamp.
ResourcesPricingAbout
Daily and shift routines12 checksdailyabout 5 minutes, estimate; adjust for site

End of day cash checklist

This checklist covers counting cash, matching receipts and locking up (trading and retail). Tick each item at the point of work and record any failure.

0 of 12 checked

1Before the shift or opening

  • Opening cash float is recordedMUST
  • Each cash sale has a receipt
  • Cash expenses have vouchers
  • Customer returns are entered

2At the point of work

  • Cash in drawer is counted by denomination
  • Digital receipts match settlement records
  • Credit sales are not counted as cash
  • Any shortage is recorded immediatelyMUST

3Before handover or close

  • Closing cash matches expected balance
  • Variance has owner and reason
  • Cash is secured in an approved placeMUST
  • Closing sign-off is completedMUST
Send it on WhatsApp

When to use it

The cashier uses this list once during the relevant working day. Allow about 5 minutes for the checks, plus time for any problem found. Work from the shift board, daily register or open-issues sheet. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: counting cash, matching receipts and locking up (trading and retail). First confirm opening cash float is recorded, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The cashier records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when cash in drawer is counted by denomination cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking each cash sale has a receipt without looking at the actual item or source record.
  • Writing "done" when digital receipts match settlement records has not been checked.
  • Closing the sheet even though closing cash matches expected balance is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a packaging business, adapt the references to the part, lot, machine or delivery document your team actually uses. In plastics, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the cashier which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the end of day cash checklist?

The cashier who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if opening cash float is recorded cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →