lamp.
ResourcesPricingAbout
Daily and shift routines12 checkseach timeabout 5 minutes, estimate; adjust for site

Gate and security checklist

This checklist covers every vehicle, material and visitor in and out recorded at the gate. Tick each item at the point of work and record any failure.

0 of 12 checked

1Before the shift or opening

  • Visitor register has the entry purpose
  • Visitor contact is recordedMUST
  • Host confirms the expected visitor
  • Required visitor identification is checked [VERIFY]

2At the point of work

  • Incoming vehicle number is recordedMUST
  • Incoming material has a challan
  • Outgoing material has an authorised gate passMUST
  • Driver and transporter are recorded

3Before handover or close

  • Visitor exit time is entered
  • Returned visitor pass is counted
  • Gate pass matches goods leavingMUST
  • Unresolved entries are escalated to the shift lead
Send it on WhatsApp

Check before you rely on it. These need a check for your site or with the official source: Required visitor identification is checked. This is a practical starting list, not a legal or safety certificate.

When to use it

The gate security officer uses this list each time this job or event occurs. Allow about 5 minutes for the checks, plus time for any problem found. Work from the shift board, daily register or open-issues sheet. Look at the actual item before ticking it. Mark No when evidence is missing and explain why.

Its scope is specific: every vehicle, material and visitor in and out recorded at the gate. First confirm visitor register has the entry purpose, then examine the relevant work before approval or handover. The person named at the top should complete the checks as the work happens. Do not sign a page from memory later.

If an item is a "No"

For a failed (must) check, hold the affected work at its current stage. The gate security officer records the item, current job or lot, time and a clear note. Tell the person authorised to release that work. Do not tick Yes after simply sending a message. Recheck the item and record who accepted it before proceeding.

For this checklist, pay particular attention when incoming vehicle number is recorded cannot be confirmed. Check the supporting record or the actual material. A photo alone may not prove a measurement or approval. Note missing evidence.

For other failures, name an owner and due date. Escalate safety, compliance or customer risks before release.

Common mistakes

  • Ticking visitor contact is recorded without looking at the actual item or source record.
  • Writing "done" when incoming material has a challan has not been checked.
  • Closing the sheet even though visitor exit time is entered is still unknown.
  • Filing the page with no name, no date or no owner for failed items.

Make it your own

Print this on A4 or keep it in a shared sheet. Add a column for the person clearing each failed item. In a pump assembly business, adapt the references to the part, lot, machine or delivery document your team actually uses. In fabrication, name the local register and sign-off owner. Remove a check only if it truly cannot apply, and write down why. Do not remove critical safety or statutory checks without qualified review.

Try the list on a real job, then ask the gate security officer which records were hard to find. Keep one approved version with a revision date so the team uses the same checks.

Review required: This is a practical starting list, not a legal or safety certificate. Check the current rules and get a qualified person to review it for your site. Items marked [VERIFY] need a site-specific or official-source check before use.


A checklist only works if someone ticks it, every time, and someone reads it.

Questions people ask

Who should sign the gate and security checklist?

The gate security officer who performed the check signs it. If a different person approves release, capture that name too. Do not use another person’s signature.

What if visitor register has the entry purpose cannot be confirmed?

Mark No, describe what you looked at and hold the affected work if it is a critical item. Ask the authorised owner to decide the next action. Keep the result in the same record.

Can we use the short version instead of the full checklist?

Use the short version for a quick reminder. The full list has the remaining checks, failed-item notes and signature. Keep it for the actual decision and review.

Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →